This bathroom was completed a few weeks ago in Tubb Close Bicester. The shower is positioned in the location of an old airing cupboard that we removed to completely open up the room. The pipework was then run into the floor and feeds connected up to existing pipework below the new bath position.
The walls and ceiling were fully prepared and tiled to include two mosaic feature strips either side of the toilet and the basin to add some contrast to the marble effect tiles. The floor was levelled and also fully tiled. Alongside a new towel rail, we fitted a new bath, toilet, basin and mixer shower from combi boiler.
Find Out More About Our Bathroom Fitting Service





